500 kWp Industrial Rooftop Solar Installation at
Shreeji Cotex Cotton Mill
A 500 kWp rooftop solar plant installed at Shreeji Cotex, Shahada, delivers reliable clean energy, optimized performance, and significant cost savings for sustainable industrial operations.
500 kWp
Capacity
7,50,000 kWh
Annual Generation
650+
CO₂ Reduction
FM Global
High-Quality EPC
About the Client
Shreeji Cotex is a well-established cotton processing and textile manufacturing company based in Shahada, Nandurbar. With continuous operations and energy-intensive machinery, the company plays a crucial role in the textile production ecosystem. To enhance operational efficiency and reduce dependency on conventional power, Shreeji Cotex aimed to adopt a reliable and sustainable energy solution.
Energy & Sustainability Challenge
-
Increasing electricity costs affecting overall production efficiency
-
Need to reduce carbon footprint and move towards sustainable operations
-
Requirement for stable and uninterrupted power supply for continuous processes
-
Limited usable rooftop space due to structural and operational constraints
──◆ Why Client Chose Alligator Solar ◆──
Why Shreeji Cotex Chose Alligator Solar
Shreeji Cotex required a reliable EPC partner capable of delivering a high-performance solar solution on a live industrial site
without compromising safety, efficiency, or production continuity.
Solution Design & Engineering
Alligator Solar designed a 500 kWp rooftop solar system tailored to the plant’s structure, safety requirements, and load conditions ensuring high energy generation with full compliance and operational reliability.
──◆ PROJECT EXECUTION ◆──
Execution on a Live Manufacturing Site
The project was executed within an active manufacturing facility, with careful planning and coordination to ensure zero disruption to operations.
Detailed Site Survey
Comprehensive evaluation including shadow analysis, structural inspection, and load assessment.
Phased Installation Plan
Work executed in planned phases to maintain uninterrupted factory operations.
Safe Execution
Strict safety protocols followed to ensure secure and risk-free installation.
Testing & Commissioning
End-to-end testing ensured optimal performance before final system handover.